Jul 09 2011
Fleetwood Town FC Grandstand
Fleetwood Town FC Grandstand
|
|
Client: Fleetwood Town FC Main Contractor: F Parkinsons Engineer: Partingtons & Associates Weight: 300 tonnes Duration: 18 weeks |
|
B&B Steelworks carried out the design, supply & installation of over 300 tonnes of steelwork along with metal decking and precast concrete staircase and terrace units. | |