Bridge Strengthening Works

Temporary Support Steels to Enable Repairs to Existing M5 & M6 Motorways around Birmingham


You can download a copy of this data sheet from our downloads section.

B&B has been carrying out the temporary support steelwork on the Midland Links motorway network for the last 20 years carrying out over 40no contracts to date, the last six projects as part of the current CM framework contract. Over this period we have supplied and fabricated over 2000t of bridge support steelwork items both large and small, and handled over 6000t of free issue previously fabricated steelwork items, including the site installation, movement and dismantling of this steelwork. In addition to this most of the supports we have installed over recent years have been the larger, heavier and more difficult and logistically challenging supports on the network to date.

R121 – involving the installation of a 200te Plate Girder system
R121 – involving the installation of a 200te Plate Girder system
R53 – involving the installation of a 125te Plate Girder system
R53 – involving the installation of a 125te Plate Girder system


R97 – involving the installation of a 85te Plate Girder system
R97 – involving the installation of a 85te Plate Girder system