BT Building

BT Building, West Bromwich


You can download a copy of this data sheet from our downloads section.

Pic 1 Client: British Telecoms
Main Contractor: Bowmer & Kirkland
Engineer: BWB
Weight: 525 tonnes
Duration: 12 weeks
Bamp;&B Steelworks carried out the design, supply & erection of over 525 tonnes of steelwork along with the installation of the precast lift shafts and stairs. Pic 2